Construction work planned between Golden Donald Upper Rd and Yoho Bridge for 4.9 km (2 to 7 km east of Golden). Next update time Fri Aug 4 at 12:00 PM MDT. Alt route is available via Hwy 95 and Hwy93S. Overnight closures 10PM-7AM MDT Sun-Thur night. 30 Minute delays Mon-Thur 8PM-10PM and Fri 8PM to Sat 7AM MDT expected. Construction work between Golden Donald Upper Rd and Yoho Bridge for 4.9 km (2 to 7 km east of Golden). Next update time Tue Aug 8 at 7:00 AM PDT. 5 Minute intermittent stops for equipment movement. From 7:00 AM to 5:00 PM PDT on weekends, Tuesday, Wednesday, Thursday and Friday. Maintenance planned at MacDonald Snowshed (2 km west of West Boundary of Glacier National Park). Next update time Fri Aug 11 at 5:00 PM PDT. Oversize loads accommodated 7AM to 5PM, Mon to Sat, by calling in advance to the Traffic Coordinator: (250) 961-6685. Chase Creek Bridge: Reduced lane width: 3.95m, NO centerline barrier or delineation. Bridge construction between Coburn St and Shuswap Ave (Chase). Next update time Wed Aug 2 at 4:30 PM PDT. Please anticipate delays of 30-40 minutes. Piloted-Single Lane alternating traffic 24/7 for 8km section. Bridge construction at Jackass Summit (2 km north of Jackass Mountain Summit). The northbound sidewalk on the bridge will be closed until August 23. Vehicles unable to meet this clearance must take the detour to avoid impact. Watch for low overpass 350m past Exit 23B, clearance of only 4.32m. Exit 23B is closed, detour available via Exit 23A. Construction work at Second Narrows Bridge (North Vancouver - District). Next update time Fri Aug 4 at 3:00 PM PDT. Motorists should obey construction signage and TCPs. Outside lanes closed for Nanaimo Utility rehabilitation project. From 12:00 AM to 11:45 PM PDT on weekdays. Utility work between Crace St and Bastion St for 0.6 km (Nanaimo).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |